January 7, 2016

The good weather early in December set us back in excavation of the marina. While we were hoping for the ground to freeze a bit, water kept flowing. However, work continues and we should be cutting the channel into the lake before the end of the month. The marina lots are at building elevation and will be ready for final grading and topsoil in the spring. We have almost completed the balance of the lake front lots and will move to the north pond area after the channel into the lake is finished. It is around the pond area that we are looking to install the smaller building/camping sites. We are looking forward to being able to complete the excavation so our tree planting program can proceed. Once the pond area at the north end is done we can connect the pond and water canal to the marina which will provide direct water access to the lake from every lot in Sunset Acres Resort.